Preferred Strategy
Appendices
Appendix 1 – List of Potential Supplementary Planning Guidance (SPG)
Name of Supplementary Planning Guidance |
Update required? |
Priority? |
Affordable Housing |
Yes |
Prioritised |
Biodiversity and Geodiversity |
Yes |
Prioritised |
Green Infrastructure |
New |
Prioritised |
Renewable Energy |
Yes |
|
Landscape |
Yes |
|
Planning Obligations |
Yes |
Prioritised |
Welsh Language |
New |
|
Conservation Areas |
Yes |
|
Residential Design |
Yes |
|
Archaeology |
Yes |
|
Historic Environment |
Yes |
|
Newtown and Llanllwchaiarn Place Plan |
Yes |
|
Small Scale Horticulture Rural Enterprise Dwellings |
New |
|
Second Homes and Short Term Holiday Lets | New |
Appendix 2 – List of Supporting Documents
Background Papers |
Vision and Objectives |
Issues, Vision and Objectives - Consultation Version (January 2024) |
Powys Housing Need and Supply |
1. Local Housing Market Assessment (May 2024) |
2. Housing Land Supply (April 2024) |
3. Second Homes and Short-Term Holiday Lets (January 2024) |
4. Vacancy Rate (January 2024) |
5. Specialist Housing (March 2024) |
Powys Sustainable Settlements and Rural Communities |
1. Settlement Assessment (November 2023) |
2. Small Settlement Assessment (November 2023) |
3. Cluster Analysis (November 2023) |
4. Rural Approach (November 2023) |
5. Integrated Planning and Transport Strategy (November 2023) |
Powys Growth and Spatial Options |
Growth Options (2024) |
Spatial Options (2024) |
Candidate Sites |
Candidate Site Assessment Methodology (November 2022) |
Findings of the Candidate Site Initial Site Filter Assessment (2024) |
Other |
Infrastructure Plan |
Phosphate Position Statement |
Viability Assessment Position Statement |
Regional Context |
Gypsy and Traveller Accommodation Assessment Position Statement |
Minerals Background Paper |
Waste Background Paper |
Welsh Language Background Paper |
Self-Assessment of the Preferred Strategy Against the Tests of Soundness |
Evidence Base Documents |
Powys Retail Needs Assessment (February 2024) |
Powys Retail Review (2023) |
Employment Needs Assessment (2024) |
Landscape Character Assessment (March 2022) |
Renewable Energy Assessment |
Green Infrastructure Assessment |
Settlement Profiles |
Demographic Evidence Report (2024) |
Strategic Flood Consequences Assessment |
Draft Local Housing Market Assessment (May 2024) |
Draft Gypsy and Traveller Accommodation Assessment (2021) |
Regional Technical Statement – 2nd Review (2020) |
Open Space Assessment (2018) |
Powys Nature Recovery Action Plan |
Engagement and Stakeholder Involvement |
Engagement and Community Involvement Record (July 2024) |
Supporting Documents |
Review Report (February 2022) |
Delivery Agreement (June 2024) |
Annual Monitoring Report (2023) |
Initial Integrated Sustainability Appraisal |
Habitats Regulations Assessment Information Report |
Appendix 3 – Glossary
Definition (Acronym) |
Meaning |
Active Travel |
Walking, wheeling or cycling for purposeful journeys to a destination, or in combination with public transport. |
Adopted |
The final confirmation of the development plan as land use planning policy by the Local Planning Authority (LPA). |
Affordable Housing |
Housing where there are secure mechanisms in place to ensure that it is accessible to those who cannot afford market housing, both on first occupation and for subsequent occupiers. This definition is set out by Welsh Government under Para. 5.1 of TAN 2. |
Aggregates |
A material or rock which is mined or processed to be used for construction purposes, for example crushed rock, sand and gravel. |
Allocation |
Area of land identified within the Replacement LDP which is reserved for a specific use such as housing or employment. |
Amenity |
The pleasant or normally satisfactory aspects of a location which contribute to its overall character and its enjoyment by residents or visitors. |
Annual Monitoring Report (AMR) |
This will assess the extent to which policies in the local development plan are being successfully implemented (Regulation 37 of the Town and Country Planning (Local Development Plan) (Wales) Regulations 2005, as amended. |
Baseline |
A description of the present state of an area against which to measure change. |
Biodiversity |
The richness and variety of living things (plants, birds, animals, fish and insects etc.) which exist in a given area, and the habitats that support them. |
Bannau Brycheiniog National Park (BBNP) |
National Park covering part of south Powys. |
Bannau Brycheiniog National Park Authority (BBNPA) |
The BBNPA is the Local Planning Authority for the National Park. |
Candidate Site |
Candidate Sites are those nominated for consideration by the Local Planning Authority as allocations in an emerging Local Development Plan. |
Candidate Site Register |
Register of candidate sites prepared following a call for candidate sites by the Local Planning Authority |
Commitments |
Undeveloped land with current planning permission or land which is currently being developed. |
Completions |
Planning consents for development which have been constructed or brought into operational use. |
Conservation Areas |
An area of special architectural or historic interest designated by the Local Planning Authority within which it is desirable to conserve or enhance the character or appearance of buildings, trees or open spaces. This is a statutory designation under Section 69 of the Planning (Listed Buildings and Conservation Areas) Act 1990. |
Delivery Agreement (DA) |
Document comprising the Local Planning Authority's timetable and community involvement scheme for the preparation of the Local Development Plan (LDP) submitted to the Welsh Government for agreement. |
Development |
The carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of any buildings or land. |
Development Management |
The process a Local Planning Authority uses to determine a planning application. |
Employment Land |
Land used for the purposes of employment by one or more of the following: offices, manufacturing, research and development, storage and distribution. |
Engagement |
A process which encourages substantive deliberation in a community. Proactive attempt to involve any given group of people or section of the community. |
Evidence Base |
Interpretation of baseline or other information/data to provide the basis for plan policy. |
Future Wales |
The National Development Plan prepared for Wales by Welsh Government. |
Infill |
Development within an otherwise built-up frontage. |
Listed Building |
A building or structure included on the List of Buildings of Special Architectural or Historic Interest compiled or approved by the Welsh Ministers. The listing includes any object or structure fixed to the building/structure, or any object or structure within the curtilage of the building which although not fixed to the building forms part of the land and has done so since before 1st of July 1948. This is a statutory designation under section 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990. |
Local Development Plan (LDP) |
The required statutory development plan for each Local Planning Authority area in Wales under Part 6 of the Planning and Compulsory Purchase Act 2004. |
Local Planning Authority (LPA) |
A planning authority responsible for the preparation of a Local Development Plan and development management. |
Market Housing |
Private housing for rent or sale where the price is set in the open market. |
Mitigation |
Measures to avoid, reduce or offset significant adverse effects. |
Objective |
A statement of what is intended, specifying the desired direction of change in trends. |
Open Countryside |
Land outside the (development) boundaries of defined settlements. |
Open Space |
All space of public value, including public landscaped areas, playing fields, parks and play areas, and also including not just land, but also areas of water such as rivers, canals, lakes and reservoirs, which can offer opportunities for sport and recreation or can also act as a visual amenity and a haven for wildlife. |
Planning Obligation |
This can be a legal undertaking by a developer only, or a legally binding agreement with the LPA. Planning Obligations are finalised before planning permission is granted. They are used to ensure that a planning permission is carried out in a certain way. |
Planning Policy Wales (PPW) |
Planning Policy Wales sets out the land use planning policies of the Welsh Government. It is supplemented by a series of Technical Advice Notes. Procedural advice is provided through circulars and policy clarification letters. |
Policies |
Land use policies which describe the Council's approach for the development and use of land. |
Proposals |
Land use and development proposed by the Local Planning Authority. |
Renewable Energy |
Energy that comes from resources that are naturally replenished on a human timescale such as sunlight, wind, rain and biomass. |
Review Report |
The required statutory report under S69 of the 2004 Act and/or Reg41; to conclude on the LDP revision procedure to be followed based on a clear assessment of what has been considered and what needs to change and why, based on evidence. |
Stakeholders |
Groups or individuals whose interests are directly affected by the Local Development Plan with involvement generally through representative bodies. |
Statutory |
Required by law e.g. Act of Parliament. |
Supplementary Planning Guidance (SPG) |
Supplementary information in respect of the policies in a Local Development Plan. SPG does not form part of the development plan and is not subject to independent examination but must be consistent with it and with national planning policy. |
Sustainable Development |
Development that meets the needs of the present without compromising the ability of future generations to meet their own needs. |
Technical Advice Notes (TANs) |
Topic-based guidance published by Welsh Government to supplement Planning Policy Wales. |
Ultra Low Emission Vehicles (ULEVs) |
Vehicles which use a range of technologies including battery and hydrogen power and produce low emissions. |
Wheeler |
The use of an electric wheelchair, mobility scooter, or similar vehicle to make an active travel journey. |
Windfall Site |
A site for new development that was unallocated by an adopted Development Plan but has come forward for development during the plan period. |
Appendix 4 - Cross Referencing Objectives with Key Issues
Tables 1 to 6 below are arranged by topic heading and summarise how each Key Issue is being addressed by one or more of the Objectives.
Table 1. Climate Change - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objective 1 |
KI.1 |
Responding to Climate Change |
Table 2. Nature Recovery and the Sustainable Management of Resources - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objective 2 |
KI.2 |
Supporting Nature Recovery |
Objectives 3 and 4 |
KI.3 |
Caring for Resources |
Table 3. Key Planning Principles, Placemaking, Health and Well-being - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objectives 5 and 7 |
KI.4 |
Promoting Sustainable Transport |
Objectives 5, 6, 7 and 8 |
KI.6 |
Planning for Well-being |
Objectives 5, 6 and 8 |
KI.7 |
Supporting Healthy Lifestyles |
Objective 6 |
KI.8 |
Right Development, Right Place |
Objectives 5, 6, 7 and 8 |
KI.15 |
Local Placemaking |
Table 4. Sustainable Communities, Housing and Services - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objectives 9, 10 and 12 |
KI.5 |
Responding to Demographic Challenges |
Objective 11 |
KI.9 |
Promoting and Protecting the Welsh Language |
Objectives 10 and 12 |
KI.10 |
Planning for New Homes |
Objective 13 |
KI.17 |
Supporting Community Facilities and Community Assets |
Table 5. A Sustainable and Vibrant Economy - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objectives 14, 15, 16, 17 and 18 |
KI.11 |
Planning for a Vibrant Economy |
Objectives 15 and 17 |
KI.12 |
Planning for a Strong Farming and Rural Economy |
Objective 16 |
KI.13 |
Supporting the Mid Wales Growth Deal (MWGD) |
Objectives 15 and 17 |
KI.14 |
Supporting Tourism |
Objective 18 |
KI.18 |
Supporting Powys High Streets |
Table 6. Infrastructure, Energy and Waste - Issues and Objectives
OBJECTIVE REF. NO. |
KEY ISSUE REF.NO. |
KEY ISSUE TITLE |
Objectives 19 and 20 |
KI.16 |
Planning Infrastructure and Service Needs |
Objective 21 |
KI.19 |
Supporting Sustainable Energy: Harnessing Green Power and promoting Energy Efficiency |
Objective 22 |
KI.20 |
Managing and Reducing Waste |
Appendix 5 – Comparison of Strategic Policies against the Replacement LDP Objectives
Objective 1: Climate Change |
Objective 2: Nature Recovery |
Objective 3: Natural, Historic, and Built Environments |
Objective 4: Mineral Resources |
Objective 5: Sustainable Travel |
Objective 6: Placemaking |
Objective 7: Sustainable Growth |
Objective 8: Health and Well-being |
Objective 9: Sustainable Settlements and Communities |
Objective 10: Meeting Future Needs |
Objective 11: Welsh Language |
|
SP1 – Scale of Growth |
Yes |
Yes |
Yes |
||||||||
SP2 – Sustainable Growth Strategy |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||
SP3 – Distribution of Growth |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||
SP4 – Housing Growth |
Yes |
Yes |
Yes |
Yes |
|||||||
SP5 – Affordable and Specialist Homes |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP6 – Gypsy and Traveller Accommodation |
Yes |
Yes |
Yes |
Yes |
|||||||
SP7 – Employment Growth |
Yes |
Yes |
Yes |
Yes |
|||||||
SP8 – Retail Growth |
Yes |
Yes |
Yes |
Yes |
|||||||
SP9 – Town Centre Hierarchy |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP10 – Sustainable Tourism |
Yes |
Yes |
|||||||||
SP11 – Infrastructure |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP12 – Climate Change |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
||||
SP13 - Sustainable Transport in Regional Growth Area Cluster and Local Cluster Settlements |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
||||
SP14 - Sustainable Transport in Non-Cluster / Rural Settlements and the Open Countryside |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
||||
SP15 – Flood Risk |
Yes |
Yes |
Yes |
||||||||
SP16 – Good Design |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||||
SP17 – Creating Healthy Places |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP18 – Nature Recovery |
Yes |
Yes |
Yes |
Yes |
|||||||
SP19 – Natural Environment |
Yes |
Yes |
Yes |
Yes |
|||||||
SP20 – Green Infrastructure |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP21 – Built and Historic Environment |
Yes |
Yes |
|||||||||
SP22 – Protecting Strategic Resources |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||||
SP23 – Welsh Language and Culture |
Yes |
Yes |
Yes |
||||||||
SP24 – Protecting Social and Community Facilities |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||||
SP25 – Renewable and Low Carbon Energy Generation |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP26 – Mineral Resource Management |
Yes |
Yes |
Yes |
||||||||
SP27 – Waste Management |
Yes |
Yes |
Yes |
Yes |
Objective 12: Housing Needs |
Objective 13: Community Facilities and Assets |
Objective 14: Vibrant Economy |
Objective 15: Economic Development |
Objective 16: Mid Wales Growth Deal |
Objective 17: Tourism |
Objective 18: Town Centres |
Objective 19: Infrastructure, Utility and Service Provision Required for New Development |
Objective 20: Provision of Infrastructure and Digital Connectivity Projects |
Objective 21: Energy and Decarbonisation |
Objective 22: Waste |
|
SP1 – Scale of Growth |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
||||
SP2 – Sustainable Growth Strategy |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
||
SP3 – Distribution of Growth |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||
SP4 – Housing Growth |
Yes |
||||||||||
SP5 – Affordable and Specialist Homes |
Yes |
||||||||||
SP6 – Gypsy and Traveller Accommodation |
Yes |
||||||||||
SP7 – Employment Growth |
Yes |
Yes |
Yes |
Yes |
|||||||
SP8 – Retail Growth |
Yes |
Yes |
|||||||||
SP9 – Town Centre Hierarchy |
Yes |
Yes |
Yes |
||||||||
SP10 – Sustainable Tourism |
Yes |
Yes |
|||||||||
SP11 – Infrastructure |
Yes |
Yes |
|||||||||
SP12 – Climate Change |
Yes |
||||||||||
SP13 - Sustainable Transport in Regional Growth Area Cluster and Local Cluster Settlements |
Yes |
Yes |
Yes |
||||||||
SP14 - Sustainable Transport in Non-Cluster / Rural Settlements and the Open Countryside |
Yes |
Yes |
|||||||||
SP15 – Flood Risk |
|||||||||||
SP16 – Good Design |
Yes |
Yes |
|||||||||
SP17 – Creating Healthy Places |
Yes |
Yes |
|||||||||
SP18 – Nature Recovery |
|||||||||||
SP19 – Natural Environment |
Yes |
||||||||||
SP20 – Green Infrastructure |
Yes |
Yes |
|||||||||
SP21 – Built and Historic Environment |
Yes |
||||||||||
SP22 – Protecting Strategic Resources |
Yes |
Yes |
Yes |
Yes |
Yes |
||||||
SP23 – Welsh Language and Culture |
Yes |
||||||||||
SP24 – Protecting Social and Community Facilities |
Yes |
Yes |
Yes |
||||||||
SP25 – Renewable and Low Carbon Energy Generation |
Yes |
Yes |
Yes |
||||||||
SP26 – Mineral Resource Management |
|||||||||||
SP27 – Waste Management |
Yes |
Yes |
Yes |
Appendix 6 - Replacement LDP Housing Commitments
Settlement |
Site Name |
Not Started 2024 |
Under Construction 2024 |
Complete 2022-2024 |
Housing Market Area |
Adfa |
Land adjoining Min-y-Fford, Adfa |
5 |
0 |
0 |
Llanfair Caereinion |
Arddleen |
Land at Bryn Perthy, Arddleen |
0 |
0 |
9 |
Welshpool and Montgomery |
Arddleen |
Land adj Windy Ridge, Ardleen (Phase 2) |
0 |
0 |
9 |
Welshpool and Montgomery |
Arddleen |
Land West of Trederwen House, Arddleen |
0 |
1 |
16 |
Welshpool and Montgomery |
Beguildy |
Land north-west of Radnorshire Arms, Beguildy |
0 |
9 |
0 |
Knighton and Presteigne |
Beulah |
OS 8922, Beulah |
0 |
5 |
8 |
Builth and Llanwrtyd |
Bronllys |
Land at the rear of Bronllys CP School Bronllys |
0 |
30 |
0 |
Hay and Talgarth |
Bronllys |
Land at Bronllys to the West of Hen Ysgubor, Bronllys |
10 |
0 |
0 |
Hay and Talgarth |
Bronllys |
Former Bronllys CP School |
17 |
0 |
0 |
Hay and Talgarth |
Builth Road |
Part of Preserved Timber Products |
8 |
0 |
0 |
Builth and Llanwrtyd |
Builth Wells and Llanelwedd |
Development Off Hospital Road Hospital Road, Builth Wells |
81 |
0 |
0 |
Builth and Llanwrtyd |
Builth Wells and Llanelwedd |
Land on Brecon Road, Builth Wells |
40 |
0 |
0 |
Builth and Llanwrtyd |
Builth Wells and Llanelwedd |
2 Plas Newydd |
0 |
9 |
0 |
Builth and Llanwrtyd |
Bwlch-y-cibau |
Land adj. Llwyn Derw, Bwlch y Cibau |
6 |
0 |
0 |
Llanfyllin |
Caersws |
Plas Maldwyn Ty Gwyn Road Caersws SY17 5HA |
0 |
0 |
12 |
Llanfair Caereinion |
Castle Caereinion |
Land adjacent to Tynllan Farm Castle Caereinion |
0 |
5 |
0 |
Welshpool and Montgomery |
Castle Caereinion |
Land adjacent to Tynllan Farm Castle Caereinion |
0 |
5 |
0 |
Welshpool and Montgomery |
Castle Caereinion |
Land at Tynllan Farm, Castle Caereinion |
0 |
9 |
0 |
Welshpool and Montgomery |
Castle Caereinion |
Residential Development At Tynllan Farm Castle Caereinion |
0 |
5 |
0 |
Welshpool and Montgomery |
Cemmaes |
Land opp Glanafon |
5 |
0 |
0 |
Machynlleth |
Churchstoke |
Rear of Village Hall |
7 |
3 |
0 |
Newtown |
Churchstoke |
Adj. Fir House, Churchstoke |
38 |
0 |
0 |
Newtown |
Churchstoke |
Land adj to Buttercup House, Churchstoke |
0 |
15 |
5 |
Newtown |
Cilmery |
Site Adjacent To Belmont Cilmery |
0 |
5 |
0 |
Builth and Llanwrtyd |
Clyro |
Land Adjacent Clyro Court Farm, South of the Castle |
15 |
0 |
0 |
Hay and Talgarth |
Clyro |
Housing Development At Land Off Kilvert View |
0 |
0 |
13 |
Hay and Talgarth |
Crew Green |
Land Adjoining Bear House, Crew Green |
2 |
1 |
5 |
Welshpool and Montgomery |
Crew Green |
Land South Of Berlin Mount Crew Green |
23 |
0 |
0 |
Welshpool and Montgomery |
Forden and Kingswood |
Land at Pen y lan and adjacent to Woodluston Forden |
5 |
0 |
0 |
Welshpool and Montgomery |
Forden and Kingswood |
Residential Development At Church Farm, Forden |
9 |
0 |
0 |
Welshpool and Montgomery |
Forden and Kingswood |
Land Adj. Lyndale And Forden C In W Primary School, Forden |
23 |
0 |
0 |
Welshpool and Montgomery |
Four Crosses |
Land off B4393 at Plas Foxen Four Crosses |
0 |
0 |
23 |
Welshpool and Montgomery |
Four Crosses |
Land 200 Meters West Of Oldfield Farm, Four Crosses |
13 |
11 |
0 |
Welshpool and Montgomery |
Four Crosses |
Land At Wychwood |
12 |
0 |
0 |
Welshpool and Montgomery |
Four Crosses |
Land At Gornal Farm, Four Crosses |
35 |
0 |
0 |
Welshpool and Montgomery |
Gladestry |
Land adjacent to Yellow Jack Barn, Gladestry |
5 |
0 |
0 |
Knighton and Presteigne |
Guilsfield |
Land to East of Groes-lwyd, Guilsfield |
22 |
0 |
0 |
Welshpool and Montgomery |
Guilsfield |
Fairview Garage |
0 |
9 |
0 |
Welshpool and Montgomery |
Guilsfield |
Land At Tan Y Gaer, Guilsfield |
28 |
0 |
0 |
Welshpool and Montgomery |
Guilsfield |
Enc 2200, Sarn Meadows |
46 |
0 |
0 |
Welshpool and Montgomery |
Kerry |
PT Encs 3186 & 4186, Dolforgan |
0 |
0 |
19 |
Newtown |
Kerry |
Land Adj Uchel Dre, Common Road, Kerry |
5 |
0 |
0 |
Newtown |
Knighton |
Peter Christian Site, West St, Knighton |
18 |
0 |
0 |
Knighton and Presteigne |
Knighton |
Site adjacent to Shirley Ludlow Road, Knighton |
24 |
0 |
0 |
Knighton and Presteigne |
Knighton |
Land At Llanshay Farm, Knighton, |
103 |
0 |
0 |
Knighton and Presteigne |
Llan |
Land opposite Rock Terrace, Llan, Llanbrynmair |
5 |
0 |
0 |
Machynlleth |
Llanbrynmair |
Bryn Coch |
0 |
4 |
1 |
Machynlleth |
Llanddew |
Land Opposite Village Hall, Llanddew |
0 |
5 |
2 |
Brecon |
Llandewi Ystradenni |
Land to Rear of Llanddewi Hall, Llanddewi |
0 |
13 |
0 |
Knighton and Presteigne |
Llandrindod Wells |
Crab Tree Green, Brookland Rd, Llandrindod Wells |
50 |
0 |
0 |
Llandrindod and Rhayader |
Llandrindod Wells |
Land East Of Ithon Road Ithon Road Llandrindod Powys LD1 6AS |
0 |
79 |
0 |
Llandrindod and Rhayader |
Llandrindod Wells |
Land at Gate Farm Llandrindod |
6 |
0 |
0 |
Llandrindod and Rhayader |
Llandrindod Wells |
The Manor |
9 |
0 |
0 |
Llandrindod and Rhayader |
Llandrindod Wells |
Land At Lakeside Avenue Lakeside Avenue Llandrindod Wells |
0 |
69 |
0 |
Llandrindod and Rhayader |
Llandrinio |
Land At Trawscoed And At Orchard Croft |
48 |
0 |
0 |
Welshpool and Montgomery |
Llanfair Caereinion |
Land adj Maes Gwyn, Llanfair Caereinion |
9 |
0 |
0 |
Llanfair Caereinion |
Llangammarch Wells |
Land Opposite Pen-y-bryn, Llangammarch |
0 |
25 |
0 |
Builth and Llanwrtyd |
Llanidloes |
Lower Green, Victoria Avenue |
31 |
0 |
0 |
Llanidloes |
Llanidloes |
Land Adj Dolwenith And Tan Y Bryn Llanidloes |
96 |
0 |
0 |
Llanidloes Locality |
Llanidloes |
Former Livestock Market |
0 |
0 |
22 |
Llanidloes |
Llanigon |
Land south of Willow Glade, Llanigon |
0 |
0 |
23 |
Hay and Talgarth |
Llanrhaeadr-ym-Mochnant |
Land adj Byrnderw, Park Street, Llanrhaeadr Y M |
3 |
1 |
1 |
Llanfyllin |
Llansantffraid-ym-Mechain |
Land adj 'Cranford', Llansantffraid - Ym – Mechain |
3 |
5 |
1 |
Llanfyllin |
Llansantffraid-ym-Mechain |
Land adj Parc Bronydd, Llansantffraid ym Mechain |
4 |
2 |
0 |
Llanfyllin |
Llansantffraid-ym-Mechain |
Land next to P37 HA2, Llansantffraid |
0 |
0 |
13 |
Llanfyllin |
Llansantffraid-ym-Mechain |
(Named: Maes Y Cledrau) Development At |
0 |
0 |
13 |
Llanfyllin |
Llansilin |
Opp. Wynnstay Arms (5/055) - |
0 |
0 |
23 |
Llanfyllin |
Llanwnog |
Rear of 2700, Llanwnog, Newtown |
7 |
0 |
0 |
Llanfair Caereinion |
Llanwnog |
Land adj Church House Farm Llanwnog |
5 |
0 |
0 |
Llanfair Caereinion |
Llanwrtyd Wells |
OS 1451 Meadow View, Station Road |
5 |
1 |
10 |
Builth and Llanwrtyd |
Llanwrtyd Wells |
OS 2664 Caemawr, off Ffos Road |
14 |
3 |
0 |
Builth and Llanwrtyd |
Llanyre |
Land between Moorlands and Llyr Llanyre |
0 |
14 |
0 |
Llandrindod and Rhayader |
Machynlleth |
Travis Perkins Trading Co Ltd |
15 |
0 |
0 |
Machynlleth |
Manafon |
Land adjoining Trem Hirnant, Manafon |
5 |
0 |
0 |
Llanfair Caereinion |
Manafon |
Land Adjoining Trem Hirnant Manafon |
5 |
0 |
0 |
Llanfair Caereinion |
Middletown |
PT OS 0036 & 0041, West of Golfa Close, Middletown |
16 |
0 |
0 |
Welshpool and Montgomery |
Middletown |
Land Adjoining The Fron |
25 |
0 |
0 |
Welshpool and Montgomery |
Middletown |
Old Coal Depot Middletown Welshpool |
8 |
0 |
0 |
Welshpool and Montgomery |
Middletown |
Land Adjacent West Of |
8 |
0 |
0 |
Welshpool and Montgomery |
Montgomery |
Land Off Forden Road |
0 |
0 |
33 |
Welshpool and Montgomery |
Newtown |
PT Enc0042/1463/1658/2053/2864, Rock Farm Llanllwchaiarn |
2 |
1 |
5 |
Newtown |
Newtown |
Newtown Bowling Club Back Lane, Newtown |
0 |
0 |
26 |
Newtown |
Newtown |
Land to the south of A489 West of Mochdre Brook, Newtown |
23 |
16 |
21 |
Llanidloes |
Newtown |
Land to the north of A489 west of Mochdre Brook, Newtown |
30 |
0 |
0 |
Llanidloes |
Newtown |
Land at Severn Hts, Brimmon Close, Newtown |
0 |
23 |
0 |
Newtown |
Newtown |
Land At Rock Farm |
5 |
0 |
0 |
Newtown |
Newtown |
Land Off Garth Owen Glandwr |
14 |
0 |
0 |
Newtown |
Newtown |
Former Red Dragon Public House & Newtown Youth Centre, Newtown |
0 |
0 |
18 |
Newtown |
Newtown |
Land At Former Travis Perkins Site |
0 |
34 |
0 |
Newtown |
Newtown |
Robert Owen House |
32 |
0 |
0 |
Newtown |
Newtown |
31 Market Street, Extending Over 30 Market Street And The Building To The Rear Of No 31 |
2 |
3 |
0 |
Newtown |
Newtown |
Land South Of Llanidloes Road, Newtown |
8 |
0 |
0 |
Llanidloes |
Norton |
Land at Orchards End & Jacks View Norton |
0 |
10 |
2 |
Knighton and Presteigne |
Norton |
Development land off Will's View, Norton |
8 |
1 |
0 |
Knighton and Presteigne |
Pen-y-bont Llanerch Emrys |
Haulage Depot The Old Station Yard, Pen y Bont |
0 |
0 |
5 |
Llanfyllin |
Pontrobert |
Land adj Pant-y-Ddafad Pontrobert |
9 |
0 |
0 |
Llanfyllin |
Presteigne |
Joe Deakins Road Site, Presteigne |
35 |
0 |
0 |
Knighton and Presteigne |
Rhayader |
St Harmon Road North, Rhayader |
0 |
17 |
0 |
Llandrindod and Rhayader |
Rhayader |
Tir Gaia, Rhayader |
4 |
1 |
0 |
Llandrindod and Rhayader |
Rhayader |
Site adj to Tir Gaia, Abbey Cwm Hir Road, |
0 |
9 |
0 |
Llandrindod and Rhayader |
Rhosgoch |
Development at Old Inn Rhosgoch, Builth Wells |
10 |
0 |
0 |
Hay and Talgarth |
Sarn |
Land Opposite Oak View, Sarn |
0 |
27 |
18 |
Newtown |
Trefeglwys |
Pt Enclosure 7847 Phase 3, Trefeglwys |
0 |
0 |
6 |
Llanidloes |
Tregynon |
Land adjacent Tyn y Ddol, Tregynon |
3 |
1 |
1 |
Llanfair Caereinion |
Trewern |
Land at Gate Farm, Criggion Lane, Trewern |
0 |
9 |
0 |
Welshpool and Montgomery |
Trewern |
Land To The East Of Trewern School Trewern |
40 |
0 |
0 |
Welshpool and Montgomery |
Trewern |
Land Adjoining The Wallers Trewern Welshpool |
17 |
0 |
0 |
Welshpool and Montgomery |
Welshpool |
Burgess Land, Redbank (A/45/005) |
25 |
0 |
0 |
Welshpool and Montgomery |
Welshpool |
Land At Lansdowne House And William Ainge Court Chapel Street / Bowling Green Lane |
0 |
0 |
15 |
Welshpool and Montgomery |
Welshpool |
Neuadd Maldwyn, Severn Road, Welshpool |
0 |
66 |
0 |
Welshpool and Montgomery |
Ystradgynlais Area |
Land at Bryn y Groes, Cwmgiedd, Ystradgynlais |
56 |
53 |
8 |
Ystradgynlais |
Ystradgynlais Area |
Land at Former Cynlais School Playing Field Ystradgynlais |
0 |
11 |
0 |
Ystradgynlais |
Ystradgynlais Area |
Penrhos CP School, Brecon Road, Ystradgynlais |
42 |
0 |
0 |
Ystradgynlais |
Ystradgynlais Area |
Land At Brecon Road Ystradgynlais |
0 |
21 |
5 |
Ystradgynlais |
Ystradgynlais Area |
Land At 89 Gorof Road |
0 |
0 |
8 |
Ystradgynlais |
Ystradgynlais Area |
Pont Aur |
0 |
10 |
0 |
Ystradgynlais |
Appendix 7 – Green Infrastructure and Opportunities
Designated and Non-statutory Sites – North Powys
Designated and Non-statutory Sites – Mid Powys
Designated and Non-statutory Sites – South Powys
Opportunities – Combined Network – North Powys
Opportunities – Combined Network – Mid Powys
Opportunities – Combined Network – South Powys
Opportunities – Combined Network & Merged Protected Sites – North Powys
Opportunities – Combined Network & Merged Protected Sites – Mid Powys
Opportunities – Combined Network & Merged Protected Sites – South Powys
Appendix 8 - Assessment Matrix
Assessment of how the Vision and Objectives Align to Policy Requirements
The Development Plans Manual (Edition 3) requires Local Planning Authorities to demonstrate the relationship between the development plan's overarching Vision and Objectives and the National Sustainable Placemaking Outcomes as well as the local Well-being Objectives. This section includes an assessment matrix (Appendix 9) to demonstrate how the Replacement LDP draft Objectives, in delivering the Vision, align with:
- The National Well-being Goals from the Well-being of Future Generations Act.
- Key Planning Principles and National Sustainable Placemaking Outcomes from Planning Policy Wales.
- The objectives of the Powys Well-being Plan.
National Well-being Goals and the Five Ways of Working
The Well-being of Future Generations (Wales) Act 2015 requires the Council, as a public body, to ensure its work is "maximising the contribution to the achievement of the seven Well-being goals" and to use of the five Ways of Working".
Key Planning Principles and National Sustainable Placemaking Outcomes of Planning Policy Wales
The Key Planning Principles set out in Planning Policy Wales, represent Welsh Government's guiding vision for all development plans, including Future Wales. These principles support the culture change required to embrace placemaking and ensure that planning facilitates the right development in the right place.
The National Sustainable Placemaking Outcomes must be used to inform the preparation of development plans and the assessment of development proposals. The Outcomes provide a framework containing the factors considered to be the optimal outcome of development plans and individual developments.
Local Well-being Goals
The Well-being of Future Generations (Wales) Act 2015 makes local Well-being Plans a statutory requirement. The Powys Well-being Plan is produced by the Powys Public Service Board (PSB), which comprises: Powys County Council, Powys Teaching Health Board, Mid and West Wales Fire Service, and Natural Resources Wales. The objectives of the Well-being Plan shape the work of the PSB to deliver the Well-being Plan vision of a Fair, Sustainable and Healthy Powys.
The Powys Well-being Plan objectives are:
- People in Powys live happy, healthy, and safe lives.
- Powys is a County of sustainable places and communities.
- An increasingly effective Public Service for the people of Powys.
Integrated Sustainability Appraisal
A separate Integrated Sustainability Appraisal (ISA) of the Plan and all its components will be undertaken throughout the Plan's preparation process. This will ensure that opportunities are taken to improve the content of the Plan in achieving the goal of sustainable development.
Appendix 9 - Assessment of Replacement LDP Objectives against Policy Requirements
Objective |
WBG[14]: A Prosperous Wales |
WBG: A Resilient Wales |
WBG: A More Equal Wales |
WBG: A Healthier Wales |
WBG: A Wales of Cohesive Communities |
WBG: A Wales of Vibrant Culture and Thriving Welsh Language |
WBG: A Globally Responsible Wales |
NSPO and KPP: Making Best Use of Resources |
NSPO and KPP: Maximising Environmental Protection and Limiting Environment Impact |
NSPO and KPP: Facilitating Accessible and Healthy Environments |
NSPO and KPP: Growing Our Economy in a Sustainable Manner |
LWG[17]: People in Powys Live Happy, Healthy and Safe Lives |
LWG: Powys is a County of Sustainable Places and Communities |
LWG: An Increasingly Effective Public Service for the People of Powys |
|
Objective 1 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||||
Objective 2 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||||||
Objective 3 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||
Objective 4 |
√ |
√ |
√ |
√ |
√ |
||||||||||
Objective 5 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||||
Objective 6 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||
Objective 7 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||
Objective 8 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||||
Objective 9 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||
Objective 10 |
√ |
√ |
√ |
√ |
√ |
||||||||||
Objective 11 |
√ |
√ |
√ |
||||||||||||
Objective 12 |
√ |
√ |
√ |
√ |
√ |
||||||||||
Objective 13 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||||
Objective 14 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||||
Objective 15 |
√ |
√ |
√ |
√ |
√ |
√ |
|||||||||
Objective 16 |
√ |
√ |
√ |
√ |
√ |
√ |
|||||||||
Objective 17 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||
Objective 18 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||
Objective 19 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||
Objective 20 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
|||||
Objective 21 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
||||||||
Objective 22 |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
[14] WBG: National Well-being Goal
[15] NSPO: National Sustainable Placemaking Outcomes
[16] KPP: Key Planning Principles
[17] LWG: Powys Local Well--being Goal (Objective)